The Ironbark Mine is a new underground metallurgical coal mine that will extend the life of Fitzroy Resources existing underground operations near Moranbah in Central Queensland.

Overview
PBE Group was appointed as Principal Contractor to Fitzroy Resources for the design, supply, construction, testing, commissioning and handover of the Main Mine Substation and Surface Reticulation. The Project required the establishment of new electrical supply infrastructure from Powerlink’s 132kV network on the surface of the mine for the underground longwall operation.
Case Study PDF
Decoupling Substation AGL – Liddell Power Station case study in PDF for download.
Share this Post
Specific Services Include:
- Design
- Electrical Engineering
- Structural Engineering
- PLC/SCADA Design
- Project Management
- Reticulation Systems
- Communications Cabling
- Earthing System Design & Testing
- Switchroom Manufacture
- Substation Construction
- Commissioning
Project Highlights:
- 132/11 kV, 32 MVA Substation
- 11 kV Switchroom
- Back-up Generator
- Earth Grid
- Control Room
- Earth Grid
- Lightning Protection